Heating system
Diesel, electric, gas, LPG
Warranty
2 Years, Video and Oversea Service Agent
Type
Coating Production Line
After-Sales Service
Available
Feature
Power and Free Conveyor System
Advantage
Easy to Assemble and Disassemble
Durability
Excellent Durability and Reliability
Maintenance
Minimum Requirements
Recovery Equip.
Big Cyclone Fast Automatic Change
Oven Material
150mm Rock Wool Panel
Pretreatment
Shot Blasting/DIP Bath/Spraying
Booth Material
PP, Stainless Steel, PVC
Pollution-free operation | Safe to operate | Maximum recovery efficiency | Quick color change
- Intelligent Gun Design: Unique circuit board design solves powder groove problems on dead angles.
- Temperature Control: Effective wind system ensures temperature fluctuations within 3ºC for uniform coating.
- High Recovery Rate: Big cyclone system achieves 99.2% powder recovery, preventing dust spillover.
- Fast Color Change: Advanced supply center allows color changes in just 10 to 15 minutes.
Developing innovative, rational, and economical solutions for powder spraying since 1990. We deliver advanced powder coating equipment and turn-key solutions globally.
- Over 70 patents obtained.
- ISO9001 and CE certified quality systems.
- Laser-cut assembly lines with tolerances less than 0.2 mm.
- Proven track record with thousands of customized lines worldwide.
❓ Frequently Asked Questions
1. What information is needed for a customized powder coating design?
You should provide the material, maximum size, and weight of your workpiece, your required daily output, preferred heating power (electric, gas, diesel, etc.), and your factory dimensions.
2. How is the quality of the coating equipment ensured?
Quality is controlled through ISO9001:2015 management systems, a Technical Review Committee for design and production stages, and dedicated quality inspectors for every processing step.
3. How is the equipment installed at the customer's site?
We provide detailed installation videos and manuals. Additionally, our engineers guide the installation, debugging, and provide comprehensive training for your operators.
4. What is the powder recovery efficiency of the system?
The big cyclone recovery system is highly efficient, achieving a powder recovery rate of up to 99.2%, ensuring almost no dust spillover in the workspace.
5. How long does it take to change colors in the automatic system?
Thanks to the unique fast color change powder supply center, the entire color change process can be completed in just 10 to 15 minutes.
6. What kind of after-sales technical support is available?
We offer 12-hour response times for solutions, 60-day post-delivery tracking, remote network troubleshooting, and a 2-year warranty on components.