1 / 5
Our engineering approach involves a comprehensive analysis of cost budget and capacity requirements. By evaluating workpiece weight, size, and shape, we design optimal ground rail lengths and running modes to ensure smooth operational flow.
| Equipment Component | Primary Application |
|---|---|
| Pre-treatment System | Optimizes workpiece surface for coating. |
| Powder Coating Room | Precision spraying on workpiece surfaces. |
| Big Cyclone | Enables automatic and fast color changes. |
| Transport System | Efficient delivery of workpieces through the line. |
| Curing Oven | Ensures permanent powder attachment. |
| Heating System | Versatile fuel options: Diesel, Gas, Electric. |
Core Performance: Pollution-free operation, maximum recovery efficiency, and quick color change capabilities.